Ausnutria Hyproca B.V.

 

EPC manager
Nov. 2023 – Now
Kampen, Overijssel, Nederland
Pre – Engineering for an investments complete new building, HVAC, new MCC, cable management, supply of utility, powder handling from two towers connected to new bagging line (15-25 kg) supplied with gassing system with downstream equipment such as: IPC in process control like, weighing, metal check and print control, palletising with toploader, inline wrapping *(topsheet and pallet) labling applicator and convering (CAPEX proposal) including FEP documents and quick and dirty schedule into 10 mnd dry and wet test (dec-2024 handover)

EPC Manager
Okt – Nov 2023 Ausnutria Kampen

Pre – Engineering for an investments new building, HVAC, power handling to new bagging line (15-25 kg) supplied with gassing system with downstream equipment  (CAPEX)

2 years 2 months
Startup-manager
October 2017 – December 2017 (3 months)

Projectmanager
January 2016 – October 2017 (1 year 10 months)

Project Engineer
November 2015 – December 2015 (2 months)

Start up manager of:
Three Dry Blending (high volumes)
Two Pre-mix line, new designed equipment (semi-automatic, preparation,
collecting, macro’s and
micro’s and mixing.

Projectmanager:
Work activities and deliverables:
The Scope of Work (SOW) for a new dairy factory in Heerenveen, The
Netherlands. I am responsible for four projects:
FED to FAT installation;
SAT & start up;
Validation; IQ (Walkdown) OQ
Commercial production PQ and handshake to operations.

Supply of work:
Two Pre-mix line (apotheek, collecting macro’s and micro’s and mixing)
Three Dry Blending
Two Canning & filling line (high speed tin cans sizes 99 , 127 and 153 mm)
BIB (Bag in Box) line (on-going project)

Project Engineer:
Work activities and deliverables:
Review the scope of work
Pre-mix
Dry Blending
Canning line & filling
BIB (Bag in Box) line