Mead Johnson Nutrition

Packaging engineer , projects equipment and process improvements ,
packaging line developments
September 2015 – December 2015 (4 months).

Project Manager / Leader / Mechanical Engineer of process and
packaging infant formula food
September 2011 – August 2014 (3 years)

Continuous Improvement Manager for a new Canning line with tin cans of 99
and 127 mm .

Year 2011:
Optimization Canning line with new leaflet inserter, Sticker Applicator and
automatic Inline Wrapping installation for shippers also NMDB process powder
handling.

Year 2012 and 2013:
Support new project Bag in Box (BIB) included powder handling (pneumatiek
transport and equipment)
FAT off-site and SAT onsite, including Installation , Operational and
Performance Qualification, (400 gr-600 gr Pouches) validation summery
reporting , etc ) validate and implement according to the GAMP mythology
Perform all maintenance work required to maintain operation of plant and
process areas with minimal downtime (Early Equipment Management)
Canning Line:
New X-Ray , responsible of Validation Master Plan (VMP) Report for FAT /SAT
and installation (according to GQA/QA).

Year 2014
Project Manager of Debottleneck Canning Line
Installed in 12 day a new designed Canning line according to the GMP and
new standard in the dairy
In scope and key activities,
• Buffer for pallets with empty cans; including facilities to strip foil from pallets
for pallet heights
• De-palletizing
• Can cleaner and heating supply for empty can
Page 8 of 12
• Quality inspection of cans with automatic reject
• Cans transport and transfer
• End/lid handling and cleaning supply
• Vacuum & gassing system
• Capping equipment
• Communication with overall line control system and Intelligently controlled
• FAT and SAT
• Including commissioning and start-up (ramp up time 2-3 week