Ausnutria
EPC Manager

November 2023 - February 2024 (4 months) Kampen, Overijssel, Nederland CAPEX proposal : Pre – Engineering for an investments complete new building, HVAC, new MCC, cable management, supply of utility, powder handling from two towers connected to new bagging line (15-25 kg) supplied with gassing system with downstream equipment such as: IPC in process control like, weighing, metal check and print control, palletising with toploader, inline wrapping *(topsheet and pallet) labling applicator and conveyors, including FEP documents and quick and dirty schedule into 10 mnd dry and wet test (dec-2024 handover)

Startup-manager

October 2017 - December 2017 (3 months) Heerenveen, Provincie Friesland, Nederland Start up manager of: Three Dry Blending (high volumes) Two Pre-mix line, new designed equipment (semi-automatic, preparation, collecting, macro's and micro's and mixing. Two Canning & filling lines (high capacity of tin cans, sizes 99 (336cpm), 127 (216cpm) and 153 (180cpm) mm) with control devices (CCP-CP) for high quality level.

Projectmanager

January 2016 - October 2017 (1 year 10 months) Heerenveen Work activities and deliverables: The Scope of Work (SOW) for a new dairy factory in Heerenveen, The Netherlands. I am responsible for four projects: FED to FAT installation; SAT & start up; Validation; IQ (Walkdown) OQ Commercial production PQ and handshake to operations. Supply of work: Two Pre-mix line (apotheek, collecting macro's and micro's and mixing) Three Dry Blending Two Canning & filling line (high speed tin cans sizes 99 , 127 and 153 mm) BIB (Bag in Box) line (on-going project) * Designed according the most recent and highest standards of food and dairy

Project Engineer

November 2015 - December 2015 (2 months) Heerenveen Work activities and deliverables: Review the scope of work Pre-mix Dry Blending Canning line & filling BIB (Bag in Box) line

Ausnutria