Start up manager of: Three Dry Blending (high volumes) Two Pre-mix line, new designed equipment (semi-automatic, preparation, collecting, macro’s and micro’s and mixing.
Projectmanager: Work activities and deliverables: The Scope of Work (SOW) for a new dairy factory in Heerenveen, The Netherlands. I am responsible for four projects: FED to FAT installation; SAT & start up; Validation; IQ (Walkdown) OQ Commercial production PQ and handshake to operations. Supply of work: Two Pre-mix line (apotheek, collecting macro’s and micro’s and mixing) Three Dry Blending Two Canning & filling line (high speed tin cans sizes 99 , 127 and 153 mm) BIB (Bag in Box) line (on-going project)
Project Engineer: Work activities and deliverables: Review the scope of work Pre-mix Dry Blending Canning line & filling BIB (Bag in Box) line